Track
Project title |
Client |
Scope of works |
Deadline |
---|---|---|---|
1 465 000 m3 of earth movement | |||
Railway line Mechrra- Bechar on 141 km | ANESRIF / SNTF | Reinforced concrete Achievement of 02 stations |
23 months |
REALIZATION IN PROGRESS | |||
Track-doubling and modernization of the installations of railway line Setif- Al Ghourzi on 78 km | ANESRIF / SNTF | 698 266 m3 of earth movement, 2 260 m3 of reinforced concrete | 25 months |
Carrying out the railway line Tissemsilt – Boughzoul on 139 km | ANESRIF /SNTF | Embankments: 10 132 918 m3 Spoil: 6 821 563 m3 Foundation layer: 1.058.551 m3 Sub-ballast layer: 481 960 2 stations (Tissemsilt and Sidi Ladjal) |
43 months |
Carrying out the railway Arzew ZI –Arzew City on 4 km | ANESRIF/ SNTF | 15 months | |
Carrying out of new line Tougourt – Hassi Messaoud on 154 km | ANESRIF/ SNTF | Embankments: 2 739.072 m3 Spoil: 2.257 620 m3 Foundation layer: 806.650 m3 Sub-ballast layer: 508.600 m3 Hydraulic structure: 2 063 ML |
48 months |