Project title
|
Client
|
Scope of works
|
---|
Gas pipeline 48” GR5 Reggane – Krechba LOT 1 over 150 Km | SONATRACH | 150Km |
10″ Illizi Djanet gas pipeline over 229 km | SONATRACH | 231km |
16″ Tidkelt-tamanrasset gas pipeline over 103 km | SONATRACH | 103km |
Construction of a water injection trivialization line E2A-OMP53 – 8” over 17 km | SH/DP | 17km |
Realization in EPC gas pipeline 16 “connecting BRN to MLE (main contractor) | GSA | 180km |
Connection of 15 new oil wells on the perimeter of Touat (phase 1 and 2). | SH/DP | 96km |
Tinerhert field development project towards Ohanet “First Gas” | SH/ENC | 70 KM (36 KM – 6”, 13.5 KM – 12” and 20.5 KM – 20”) 14 Wells |
Realization of the industrial water injection network for the north and center oil separator stations of Hassi R’mel | SH/DP | 30km |
Well connection Mouillah manifold MKSM Rhoud Nouss – 6” | SH/DP | 25km |
Construction of a 6” and 12” pipe line – TFT | SH/DP | 30KM (12KM 12″, 18KM 6″) |
Realization in EPC Gasoduc 12 » Tiguentourine – Assekaifaf on 109 km | SH/TRC | 109km |