Construction of a water storage tank with a capacity of 4000 m3 at the Hassi Rmel /SH/DP CTH Center station

CLIENT: SH/DP

DEADLINE OF ITS REALIZATION: 24 mois

SCOPE OF WORKS:
1 Bac de stockage de 4000 m3 + canalisation