Realization of the collection network and surface installation for the connection of 73 wells from Tinhert to Alrar – EPC 2 lot n°2 Le 10 Jul 2023
Realization of execution studies and works of VRD (primary and secondary networks) of the sites of the new city of Hassi Messaoud and the activity zone Le 09 Jul 2023
Study, supply & construction of a 24” pipeline for the shipment of crude CIS – Haoud el Hamra to Hassi Messaoud Le 30 Oct 2022
Rehabilitation of the oh1/30” oil pipeline with a 46 km fiberglass section in In Amenas – Haoud el Hamra Le 30 Oct 2022
Realization of a water storage tank with a capacity of 1000 m3 at the level of Carroubier Le 30 Oct 2022
Construction of a water storage tank with a capacity of 2000 m3 at the Hassi Rmel /SH/DP CTH Nord station Le 30 Oct 2022
Construction of a water storage tank with a capacity of 4000 m3 at the Hassi Rmel /SH/DP CTH Center station Le 30 Oct 2022