Construction of a water storage tank with a capacity of 2000 m3 at the Hassi Rmel /SH/DP CTH Nord station
CLIENT: SH/DP
DEADLINE OF ITS REALIZATION: 24 mois
SCOPE OF WORKS: 1 Bac de stockage de 2000 m3 + canalisation
CLIENT: SH/DP
DEADLINE OF ITS REALIZATION: 24 mois
SCOPE OF WORKS: 1 Bac de stockage de 2000 m3 + canalisation