Project title |
Client
|
Scope of works
|
|---|
| Reinforcement rn 3 over 80 km Illizi – Larach | DTP/ILLIZI | 80km |
| Stah road network | SH/DP | 78km |
| Road rehabilitation between RN°03 – In Amenas airport over 05 km | DTP/ILLIZI | Double track of 05 km |
| Rehabilitation of the Champ Zarzaitine road network | SH/SINOPEC | 24km |
| Rehabilitation of the rn 3 over 25 km Illizi – Djanet | DTP/ILLIZI | 25km |
| Road works over 40 km in Gassi Touil | SH/DP | 40km |
| Reinforcement of the RN 03 between Takhamelt and Tiguentourine over 20 km | DTP/ILLIZI | 20km |
| Reinforcement rn 53 in cold asphalt between Belagbour and B.Omar Idriss over 40km | DTP/ILLIZI | 40km |
| Deviation of road rn03 at Haoud el Hamra. | SH/TRC | 11km |
| Rehabilitation of the Ikerbane – In Akouet track over 60 km | DTP/ILLIZI | 60km |
| Repair of the bf11 track – In Ezzane over 22 km | DTP/ILLIZI | 22km |
| Construction of new roads and maintenance of existing roads Berkine group. | HS/AAFC | 70km |
| Construction of the access road to the Touat oil field (Hassi Ilatou) | SH/DP | New 80 km road |
| Construction works of a main access road, an airstrip and extension and rehabilitation works of the Drina airstrip – Groupement Timimoun | SH-TOTAL-CEPSA | New 120 Km road – New Baroda airstrip – Drina airstrip extension |
| Rehabilitation of the track in Ezzane- Col Danai over 115 km | DTP/ILLIZI | 115km |
| Rehabilitation of the Takisset-Col Danai track over 100 km | DTP/ILLIZI | 100km |
| Opening of the Col Danai – BF12 track over 100 km | DTP/ILLIZI | 100km |
| Study and construction of the road network for the Tidikelt gas field | SH/DP | NEW ROAD OF 61 Km |
| Study and realization of the diversion of the omp53 road in Hassi Messaoud | SH/DP | 3.4km |
| Road repairs linking the Stah field and the western Alrar field over 16 km | SH/DP | 16km |
| Lining works for the access to the wells at the level of the Bir Berkine field over a length of 20 km | SH/DP | 20km |
| Paving works on roads Zemlet Ennous 15 km | SH/DP | 15km |
| Execution of the construction works of the Ain Tsila access road | G. ISARENE | 84km |
| Paving works for access to wells and roads in the fields of Hassi Messaoud central area | SH/DP | 150km |
| Construction of the Hassi Bahamou access road | SH/EPM | 150km |
| Road surfacing works at the Bir Berkine field over a 60 km stretch. | SH/DP | 60km |