Title
Client
Scope of works
Deadline

Realization in EPC Ain Tsila life base

SH/EPM
25.300 m2
31 months

Buildings works Ain Tsila

PETROFAC
9.648 m2
24 months

Realization in EPC base of life El Borma

SH/DP
9.800 m2
28 months

Realization in EPC TFT life base

SH/TRC
8.900 m2
26 months

Realization in EPC of a new living base RTI In Amenas

SH/TRC
22.400 m2
36 months

Realization in EPC 230 studios In Amenas

SH/DP
6.900 m2
36 months

Realization in EPC Ohanet life base (700 studios)

SH/DP
46.500 m2
36 months

Realization in EPC living base Rourde Echegga

SH/EPM
6.200 m2
36 months

Construction of 24 studios at the In Akamil life base pk 60 – Ohanet

SH/DP
1.260 m2
24 months

GEM Oued Safsaf living base extension

SH/TRC
4.500 m2
24 months

Study and construction of a Mouloudia sports training and grouping center

SH
4.900 m2
30 months

Study and construction of a set of social infrastructure at HR lot1 – 200 studios

SH/DP
8.600 m2
30 months

Realization of a new administrative headquarters and archive room of the regional directorate RTI In Amenas

SH/TRC
36 months

REALIZATION OF OPERATING INFRASTRUCTURES IN ALL STATE OF THE TFT AERODROME

SH/DP
30 months